Slide 11
Slide 11 text
“The hell” – filtering and aligning capability requirements to a bare minimum
but leaving room for inspiration
11
Req_ID Capability Type Requirements Assessment Comments Reference Material Control reference
CO_L1_001 Level 1 Control
The integrity of the configuration items used for my applications and services is guaranteed by a fully accurate and timely updated Configuration Management Database (CMDB) by my team in
ServiceNow.
To be filled in
CBSP reference information will be shared during CBSP QuickScan sessions.
https://intranet.nl.eu.abnamro.com/nl/assets/108-48-20-IT-Configuration-Management-Policy-July2019_tcm582-
1743557.pdf
C-00006187 - EC_ISO-04 Application inventory
CO_L1_002 Level 1 Control
Service recovery plans must be available for CIA rating Availability = 1 and for CIA rating Availability =2 and must be updated at least once a year.
Disaster Recovery tests are defined and scheduled for all our application(s) with CIA Availability = 1. Results are registered in DR Dashboard on connections.
Disaster Recovery test is performed at least every 12 months for our applications with Recovery Time Objective (RTO) 0-1,
and at least every 24 months for all our applications with RTO 2-4.
To be filled in
CBSP reference information will be shared during CBSP QuickScan sessions.
https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=2690c749-1ae7-403f-9a99-a32b6e59fe5e.
C-00007725 - Service Recovery Plans are available
C-00007726 - Quarterly the BCO verifies that the frequency of DR testing matches the frequency required by the BCM policy
C-00007727 - Quarterly the IT-SCM SPoC monitors timely execution of planned DR and , if applicable, follow-up
C-00007728 - Quarterly the Business Continuity Officer verifies recording of DR related issues, including recording of proper follow-up
CO_L1_003 Level 1 Control
All applications owned by my team are registered in the One Application Referential (OAR ).
To be filled in https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=b627c98d-7e64-4ed1-8d38-2f8d002ec03a C-00012952 - The application data in the Asset Inventory is complete
CO_L1_004 Level 1 Control
Block administration is up-to-date with all required information (see Guidelines on connections page).
Please pay attention to:
- all necessary information on what your block is supporting: owned OAR's, block email, email addresses of team members, phone numbers.
- correct administration of your teams DevOps roles as this will define your teams rights in ServiceNow (Product Owner, Scrum Master, IT Engineer etc.)
- update AGF with relevant team information.
To be filled in https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=3b27a50e-d57c-46ee-9d91-8c5fd94e695a C-00014834 - Quarterly I&A performs a check on the manual part of the JoMoLea process, C-00015173 AWS - IAM setup and Monitoring
CO_L1_005 Level 1 Requirement
Service Administration in ServiceNow is up-to-date:
- All relations of your applications are defined in ServiceNow (upstream & downstream relations) and understood by the entire team.
- All stacks/resource groups/Configuration Items are tagged to the correct Business Application of your Business Service
- All end users are subscripted to the service, in order to be able to raise calls via de Self-serving portal. (if applicable).
To be filled in https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=37ce103e-1701-4ab1-9954-a1a635967946 Not Applicable
CO_L1_006 Level 1 Requirement
Roles & responsibilities:
- Process roles to handle Major and Complex Incidents including the communication via the prescribed channels are formally recognized, defined and assigned in the DevOps team.
- Process roles to approve Root Cause Analysis documents and the underlying SIP actions are formally recognized, defined and assigned in the DevOps team.
- Segregation of accountability and responsibility between the Product Owner, IT Lead and the DevOps team with regard to the execution of the Incident and Problem process is fully implemented.
- Segregation of accountability and responsibility between the Product Owner, IT Lead and the DevOps team and between Dev-engineers & Ops-engineers with regard to the execution of the Change
Management process is fully implemented (e.g. There is a single owner who is responsible for assessing Major and Emergency changes).
To be filled in Not Applicable
CO_L1_007 Level 1 Control
Only the central IT service management tooling (ServiceNow) is used for core processes Incident, Problem, Change and Call management.
To be filled in
https://ibmaabpr.service-
now.com/u_published_documents_dms_revision_list.do?sysparm_userpref_module=6a46d7c04f385300feb3d19f0310c75d&sysparm_view=OPS%20Manu
al&sysparm_query=dms_type=ee5155444ffc9340a300d2ff0310c797^ORdms_type=d7649d804f30d340a300d2ff0310c7a9^ORdms_type=75e459c04f30d34
0a300d2ff0310c76c^ORdms_type=565595044f30d340a300d2ff0310c74c^ORdms_type=70f5d1c44f30d340a300d2ff0310c754^ORdms_type=4f36d5c44f30d
340a300d2ff0310c7bd^EQ^GROUPBYdms_u_record^ORDERBYdms_type^ORDERBYrev_attachment&sysparm_clear_stack=true
C-00010849 Incidents are registered correctly
C-00010877 Yearly the effectiveness of automated controls for change management in the Service Management Application is tested
CO_L1_008 Level 1 Control
On call duty for DevOps team members during and outside office hours is in place for owned critical applications and business services chain(s) with impact (CIA for Availability = 1).
To be filled in
Will be worked out by Apollo program and published when available. Check this Apollo page:
https://social.connect.abnamro.com/wikis/home?lang=nl#!/wiki/W7a3dfeeec2fa_4143_a0dc_1ac023f65e31/page/Organisational%20Design
C-xxxxxxxx- to be provided
CO_L1_009 Level 1 Control
Service Commitments ( e.g. SLA ) are defined for Availability for each application with Availability level 1 for team and vendor performance
To be filled in https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=b9928e38-76df-4863-8e69-3c66d72e370a C-00014804 - IT Incident Management resolution times are met
CO_L1_010 Level 1 Control
For every off-premises application, the team has delivered an exit plan according to the existing ABN AMRO exit strategy. This plan is fitting for use and nature of the concerning application and is
approved by responsible DAO and BAO. To be filled in https://social.connect.abnamro.com/wikis/home?lang=nl#!/wiki/W4a15ff48670e_4510_a692_e52743f8cd78/page/Set%20up%20Exit%20strategy C -00015176 AWS - Secure disposal of data,
CO_L2_011 Level 2 Requirement
When responsibilities have changed (e.g. due to higher maturity or changes in your team) block administration is updated.
To be filled in
https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=3b27a50e-d57c-46ee-9d91-8c5fd94e695a
(also contributes to RCF control: C-00014834 - Quarterly I&A performs a check on the manual part of the JoMoLea process)
Not Applicable
CO_L2_012 Level 2 Requirement
The team knows where to find the change calendar and how to use it to speed up the Root Cause Analyses (e.g. technical analysis) process in case of disturbances
To be filled in https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=aa328a19-ed02-49be-801b-c2b6c39d3883 Not Applicable
CO_L2_013 Level 2 Requirement
To reduce the number and impact of future incidents, Problem Management is used by the team to identify the actual cause of one or more incidents through recurring incident analysis
To be filled in https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=1890cce5-6a88-4140-931d-192330bed0ad Not Applicable
CO_L2_015 Level 2 Control
A status change of a Configuration Item stored in the Service Now configuration management database can only be done following the change management process.
To be filled in https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=b325f6cb-c415-4849-80f4-1ab83ed7e255
C-00011327 LC_IT-04 Deltas of the reconciliation between the CMDB and the daily infrastructure scan are discussed and followed up
C-00011328 LC_IT-04 Differences between changed CIs and registered CI changes in ServiceNow Blue are discussed with IBM and monitored
C-00015869 LC_IT-04 Differences between changed CIs and registered CI changes in CMDB are discussed with DevOps teams
CO_L2_016 Level 2 Control
Retention/backup services are in place according to RTO - RPO requirements agreed with Business.
To be filled in
CBSP reference information will be shared during CBSP QuickScan sessions.
For AWS refer to:
https://social.connect.abnamro.com/wikis/home?lang=en#!/wiki/Wbb310a1c98f8_4ed8_97fb_ed4d14b3a06d/page/Standards%20%26%20Guidelines
For IBM environments; refer to TSM in your team.
C-00015172 - AWS - Backup and retention of data
C-00015177 Azure - Secure disposal of data
CO_L2_017 Level 2 Requirement
Root cause analysis (RCA) are drawn up on major incidents by all suppliers including Cloud and SAAS Service providers
To be filled in Not Applicable
CO_L2_018 Level 2 Requirement
Knowledge articles in Service Now for user support are created and published
To be filled in
https://aabsiampr.service-
now.com/myit?id=myit_kb_article&sys_id=10ef229ddb29d3480f4416d15b961983&knowledge_base=678ec474db9ddf80bd2c83305b961966
Not Applicable
CO_L2_019 Level 2 Requirement
Availability, incident and change handling is regularly discussed with stakeholders including Cloud or SAAS-Service providers.
To be filled in Not Applicable
CO_L3_020 Level 3 Requirement
To sustain the required Business level of availability our team uses the Mean Time Between Failure (MTBF) indicator to make reliability improvements for components that have failed after a
breakdown and to shorten maintenance and repair time. To be filled in
https://social.connect.abnamro.com/wikis/home?lang=nl#!/wiki/W894ba23ada96_4868_883b_d28d07865797/page/D2C%20-
%20Detect%20to%20Correct%20-%20Value%20Stream
Not Applicable
CO_L3_021 Level 3 Requirement
An effective capacity management plan, including forecast, for all our used IT components is in place to deliver the highest quality service—at the lowest possible cost.
To be filled in
CBSP reference information will be shared during CBSP QuickScan sessions.
https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=d6a3b434-f3a7-4df2-b6ee-
f46d14809ed5&ftHelpTip=true.
Not Applicable
CO_L3_022 Level 3 Requirement
Continual Service Improvement is embedded in the DevOps way of working and improvement initiatives, derived from relevant measurements and KPis, are recorded in Service Now while the
actions themselves are put in the Back log. To be filled in https://social.connect.abnamro.com/communities/service/html/communitystart?communityUuid=692949e8-0718-40be-9385-d8b2306b4547 Not Applicable
CO_L3_023 Level 3 Requirement
The CMDB is automatically updated when changes occur in the IT Landscape
To be filled in CBSP reference information will be shared during CBSP QuickScan sessions. Not Applicable
What is mandatory and what is an
efficiency requirement?
What compliancy
is referenced?
Where can you
find detailed
information
What does my team need to
do and how do I score
myself on it