William Brown BEng (Hons) LLB (Hons) MSc LLM FCInstCES Civil Engineer, Solicitor Advocate, Adjudicator [email protected] What we do: ✓ Review contracts for commercial risks ✓ Draft contracts ✓ General advice on construction legal issues ✓ Party representation in Adjudication ✓ Training on contracts and administration

Slide 3

Slide 3 text

Agenda • Review of NEC January 2023 amendments • Helicopter view of W1 and W2 • Detailed comparison

Slide 4

Slide 4 text

January 2023 Amendments

Slide 5

Slide 5 text

NEC4 Amendments – January 2023 • Main change to W2 – “fixed” the two-week timetable for submissions DELETED

Slide 6

Slide 6 text

NEC4 Amendments – January 2023 • Main change to W2 – “fixed” the two-week timetable for submissions ADDED Still subject to W2.3(8) i.e. 28 days (+ extensions)

Slide 7

Slide 7 text

NEC4 Amendments – January 2023 • Further change to W2 – Relocated some of the Adjudicator’s powers DELETED ADDED This wording was previously in W2.3(4) – not new.

Slide 8

Slide 8 text

Helicopter View of W1 and W2

Slide 9

Slide 9 text

Helicopter View – W1 and W2 • Option W1 • Dispute referred to the Senior Representatives in the first instance • In accordance with the Dispute Reference Table • If dispute is not resolved, then referred to the Adjudicator • Then Tribunal, subject to notice • Option W2 • “If the parties agree” then dispute can be referred to the Senior Representatives • - • Dispute referred to the Adjudicator in the first instance • Then Tribunal, subject to notice In a nutshell, where disputes are referred and decided in the first instance is different

Slide 10

Slide 10 text

Helicopter View – W1 and W2 • Option W1 – Adjudication when HGCRA 1996 does NOT apply • Option W2 – Adjudication when HGCRA 1998 applies Perhaps slightly misleading?

Slide 11

Slide 11 text

Helicopter View – W1 and W2 • What if? This is a workshop after all! • What if the Parties selected W1, but the HGCRA 1996 did in fact apply? • i.e. selected W1, but the contract was a “construction contract” per s.104 HGCRA 1996? • What if the Parties selected W2, but the HGCRA 1996 did NOT in fact apply? • i.e. selected W2, but the contract was not a “construction contract” • Or… selected W2, it was a “construction contract”… but in Northern Ireland?

Slide 12

Slide 12 text

Detailed Comparison

Slide 13

Slide 13 text

W1.1 / W2.1 – Senior Representatives

Slide 14

Slide 14 text

Option W1 v W2 – Senior Representatives • W1.1 – Senior Representatives • (1) – Refer to SRs… in accordance with the Dispute Resolution Table Condition precedent? - 1st row, could cause issues - 2nd and 3rd, should be clear

Slide 15

Slide 15 text

Option W1 v W2 – Senior Representatives • W2.1 – Senior Representatives • (1) – Refer to SRs… if the parties agree “I do not agree with what you have to say, but I’ll defend to the death your right to say it” - Voltaire

Slide 16

Slide 16 text

Option W1 v W2 – Senior Representatives • W1.1 / W2.1 – Senior Representatives • (2) – Notification and statements of case • Referring party notifies Senior Representatives, other Party and Project Manager • Notification of “the nature of the dispute it wishes to resolve” • Statements of case to follow within one week of notification • Limited to 10 sides of A4 paper together with supporting evidence

Slide 17

Slide 17 text

Option W1 v W2 – Senior Representatives • W1.1 / W2.1 – Senior Representatives • (3) – Resolving the dispute • Senior Representatives have meetings and use any procedure necessary • No more than a 3-week period • At the end of 3-weeks, produce list of issues agreed and not agreed • Agreed – put in to effect by Project Manager and Contractor • Not agreed – can move on to adjudication under W1.3(1). WARNING! Notice of adjudication must be issued within 2 weeks under W1.

Slide 18

Slide 18 text

Option W1 v W2 – Senior Representatives • W1.1 / W2.1 – Senior Representatives • (4) – Without prejudice • Statement of case and discussions cannot disclosed, used or referred to • In proceedings before the Adjudicator or the tribunal

Slide 19

Slide 19 text

W1.2 / W2. – The Adjudicator

Slide 20

Slide 20 text

Option W1 v W2 – The Adjudicator • Bits that are the same • Adjudicator appointed under NEC Dispute Resolution Service Contract • Duty to act impartially • Power of replacement Adjudicator to determine disputes referred to predecessor • No liability unless acting in bad faith • Bits that are different • W2 – Time periods exclude Christmas Day, Good Friday and bank holidays • If Adjudicator resigns or cannot act, ANB must choose within 7 days (W1) or 4 days (W2) • W2 – A party does not refer a dispute which has already been decided

Slide 21

Slide 21 text

W1.3 / W2.3 – The adjudication

Slide 22

Slide 22 text

Option W1 v W2 – The adjudication • Notice of adjudication • W1.3(1) – Party disputing issues not agreed by SR must issue notice of adjudication within 2 weeks of when list of issues was (or should have) been produced – see W1.1(3) • W1.3(1) – Notice of adjudication issued to other Party and Project Manager • W1.3(2) – Times for notifying / referring a dispute can be extended by agreement • W1 – No express requirement for Adjudicator to inform Parties that they can act (3 days under W2)

Slide 23

Slide 23 text

Option W1 v W2 – The adjudication • Referral • W1.3(3) – All submissions to be provided within 4 weeks of the referral (Adjudicator decides this under W2*) • W1.3(4) / W1.3(3) – Joinder of subcontract disputes • W1.3(6) / W1.3(6) – Simultaneous communications *was previously 14 days, amended in January 2023

Slide 24

Slide 24 text

Option W1 v W2 – The adjudication • Powers of the Adjudicator • W1.3(5) / W2.3(4)(8)* – Same powers • Review and revise any action or inaction of the Project Manager or Supervisor… • Take the initiative in ascertaining the facts and the law… • Instruct a Party to provide further information… • Instruct a Party to take any action… • W2.3(7) – any additional amount due is payable 7 days after the date of the decision *these powers were split across two clauses in January 2023 amendments

Slide 25

Slide 25 text

Option W1 v W2 – The adjudication • The decision • W1.3(8) – decision due within 28 days of “the end of the period for receiving information” i.e. the four-week period under W1.3(3) • Can only be extended with agreement of BOTH Parties. • W2.3(8) – decision due within 28 days of referral • Can be extended by 14 days with permission of referring Party, or any other period with BOTH agreeing • W1.3(9) / W2.3(9) – Awaiting decision, Parties proceed as if the matter was not disputed • W1.3(10)/W2.3(11) – Decision is binding, unless and until revised by the tribunal • W2.3(10) – Parties can agree to extend date for decision if Adjudicator is late • W1.3(11)/W2.3(12) – Slip rule is 14 days in W1, and 5 days in W2

Slide 26

Slide 26 text

W1.4 / W2.4 – The tribunal

Slide 27

Slide 27 text

Option W1 v W2 – The tribunal • Bits that are the same • Need to adjudicate first • Requirement to issue notice of dissatisfaction as a condition precedent to the tribunal • Powers of the tribunal • Adjudicator cannot be called as a witness • Bits that are different • Under W2 – if Adjudicator fails to make decision, treated as having resigned, see clause W2.3(10). Therefore, requirement to start Adjudication again before going to the tribunal • Under W1 – if Adjudicator fails to make decision, this triggers a requirement to issue notice of dissatisfaction and may be taken to the tribunal

Slide 28

Slide 28 text

William Brown BEng (Hons) LLB (Hons) MSc LLM FCInstCES Civil Engineer, Solicitor Advocate, Adjudicator [email protected] What we do: ✓ Review contracts for commercial risks ✓ Draft contracts ✓ General advice on construction legal issues ✓ Party representation in Adjudication ✓ Training on contracts and administration