Slide 1
Slide 1 text
#shipping at Stripe Greg Brockman Stripe CTO // @thegdb
Slide 2
Slide 2 text
Beta from 1, ship at 9 0 10 Project completion
Slide 3
Slide 3 text
Minimize distance to the first production use Time to shard everything: 3 months (projected) ! Time to shard internal collection: 1 week
Slide 4
Slide 4 text
We are not special
Slide 5
Slide 5 text
Bus factor: not just for bus accidents
Slide 6
Slide 6 text
Build vs run
Slide 7
Slide 7 text
Manage rather than eliminate technical debt Image Credit: Philippe Kruchten
Slide 8
Slide 8 text
Design the best possible product, and incrementally modify until it can be built.
Slide 9
Slide 9 text
Design dictators
Slide 10
Slide 10 text
Email transparency. SRFCs.
Slide 11
Slide 11 text
Greg Brockman Stripe CTO // @thegdb