Slide 1

Slide 1 text

#shipping at Stripe Greg Brockman Stripe CTO // @thegdb

Slide 2

Slide 2 text

Beta from 1, ship at 9 0 10 Project completion

Slide 3

Slide 3 text

Minimize distance to the first production use Time to shard everything: 3 months (projected) ! Time to shard internal collection: 1 week

Slide 4

Slide 4 text

We are not special

Slide 5

Slide 5 text

Bus factor: not just for bus accidents

Slide 6

Slide 6 text

Build vs run

Slide 7

Slide 7 text

Manage rather than eliminate technical debt Image Credit: Philippe Kruchten

Slide 8

Slide 8 text

Design the best possible product, and incrementally modify until it can be built.

Slide 9

Slide 9 text

Design dictators

Slide 10

Slide 10 text

Email transparency. SRFCs.

Slide 11

Slide 11 text

Greg Brockman Stripe CTO // @thegdb