Slide 20
Slide 20 text
20
© 2023 CENTER FOR RESOURCE SOLUTIONS. ALL RIGHTS RESERVED.
Stage 6. Full Implementation
Project/Supply Criteria
Project(s) not yet in operation or repowered at the time of supplier's initial engagement
Project location(s) in a grid region with an annual marginal emissions rate that is greater
than the national average marginal emissions rate
GHG emissions from the electricity sector or region where project(s) is located are not
capped, or there is a policy mechanism in place to set aside and retire emissions allowances
on behalf of voluntary renewable energy, or emissions allowances are independently
procured and retired
Project(s) built, repowered, or directly financed by supplier
Project(s) directly associated with immediate or near-term fossil plant retirement, either
physically, legally, contractually, or in some other verifiable way
New transmission has been created to serve the project(s)
Project(s) operates during seasonal or daily peaks, or during times of day when fewer
renewable resources are operating
Purchase/Transaction Criteria
Purchase term/contract length >=1 year
Active and voluntary purchasing by supplier
Transacted clean electricity is accompanied by emissions allowance retirement, where
applicable to project location(s)
Long-term purchase (>=10 years)
Bundled procurement
Desired Outcome Metric
Provide demand to drive the
development of clean
electricity
Portion of clean electricity used that is surplus to regulation
in the electricity sector
Portion of clean electricity used from facilities that were not
yet in operation or repowered at the time of Supplier's initial
engagement
Portion of clean electricity procured under long-term
contracts (>= 10 years)
Portion of clean electricity actively and voluntarily procured
Change in market price of generation, storage, and/or
transmission
Avoid grid emissions Avoided grid emissions associated with procured clean
electricity generation (tons)
Reduce global emissions Annual tons reduced by the project beyond an emissions
baseline
Directly enable/create new
clean electricity
capacity/supply
Clean electricity capacity installed that was directly financed
by the Supplier (MW)
Grid transformation and
clean electricity integration
Reduced curtailment (MWh)
Amount of peak generation (MWh)
Miles of new transmission
Amount of storage capacity added (MW)
Example: New Clean Electricity and Emissions Impact
Verification Metrics
Criteria