A primer on Axiomatic Design applied to organization design Supporting material for Worren (2026) PART 3 Nicolay Worren Professor Norwegian University of Life Sciences

Slide 2

Slide 2 text

Topics 1. Why Axiomatic Design? 2. The core axioms 3. Case studies 4. Beyond the basics

Slide 3

Slide 3 text

Decoupling of FRs in social system (1) FR #1: Appropriate repertoire for the older children FR #2: Appropriate repertoire for the younger children Constraint: Limited resources Coupling= Complexity

Slide 4

Slide 4 text

Decoupling of FRs in social system (2) 5:30 pm: The younger children meet and practice for 30 minutes 6:00 pm: The older children arrive and everybody practices together for half an hour 6:30 pm: The younger children leave – the older children practice until 7:00 pm FR #1: Appropriate repertoire for the older children ✓ FR #2: Appropriate repertoire for the younger children ✓ Constraint: Limited resources (Additional advantage: The younger children can learn from the older ones)

Slide 5

Slide 5 text

Dual case Based on Visnjic et al. 2022* • Manufacturer of industrial air compressors • May have more than 10 year life span • Require regular service and maintenance *Visnjic, I., Jovanovic, M., & Raisch, S. (2022). Managing the transition to a dual business model: Tradeoff, paradox, and routinized practices. Organization Science, 33(5), 1964–1989.

Slide 6

Slide 6 text

1 Original structure CEO PC PC PC PC Division 1 Division 2 Division 3 Division 4 CC CC Engineering Production Maintenance CC & repairs RC Sales CC Cost center RC Revenue center PC Profit center

Slide 7

Slide 7 text

2 New organizational structure CEO “Dealing with the issues between products PC PC Division 1 Division 2 PC PC Manufacturing BU CC CC Engineering Production and servicesPC took so much organizational PC energy that3 it was easier for 4[the General Division Division Manager] to compromise or find other ways to avoid them…But that didn’t mean anyone was really satisfied with the CC Cost center solution…The tensions…remained Revenue center RC extremely high.PC” Profit center Services BU RC Sales CC Services Delivery RC Sales Marketing manager

Slide 8

Slide 8 text

Outcomes Accountable units Actual structure Unit mandates Maximize profits by manufacturing and selling air compression Maximize profits by selling and performing equipment maintenance and upgrades + ~ Manufacturing business unit ~ + Outcome Services business unit Functional Conflict /coupling

Slide 9

Slide 9 text

3 Suggested alternative CEO PC PC PC PC Division 1 Division 2 Division 3 Division 4 CC CC Manufacturing BU Services BU RC Sales and Market CC Cost center RC Revenue center PC Profit center

Slide 10

Slide 10 text

Dual case (based on Visnjic et al. 2018) 3 Accountable units Unit mandates Actual structure 2 Potential re-design 3 Maximize profits by manufacturing and selling air compression Maximize profits by selling and performing equipment maintenance and upgrades Market and sell air compression equipment and maintenance services Manufacture air compression equipment Provide maintenance services + ~ + + + + ~ Manufacturing business unit Services business unit Outcome • Functional Conflict (Coupling) • Paradox Sales and Marketing unit Manufacturing business unit Services business unit • Decoupling of conflicting FRs • Attenuation of paradox

Slide 11

Slide 11 text

Five key interventions # Intervention Example Functional perspective (AD) Axiom 1 Axiom 2 I Reduce aspiration level Reduced global growth ambitions in Google in 2006 (Li, 2021) FRs are formulated less stringently allowing current DPs to satisfy them x X II Improve unit capability Introduction of AI-tools in security operations centers (Saadallah et al., 2025) The FRs remain the same but DPs are improved or new DPs are adopted that reduce coupling x X III Separate temporally Childrens’ orchestra Actions of the relevant DPs are allocated to different time periods to avoid coupling of FRs. X IV Separate structurally Digital innovation units in nine firms (Cepa & Schildt, 2022) FRs are decoupled by allocating them to two different DPs instead of one X V Re-design architecturally Proposed re-design of “Dual company” (Worren & Pope, 2027) FRs are decoupled by utilizing modular principles to redefine and/or restructure DPs X

Slide 12

Slide 12 text

AD is not about separation per se “…the claim that paradox theorists have ignored design-based or structural interventions is inaccurate: structural separation, temporal cycling, and spatial differentiation have long been part of the literature’s paradox management strategies (Berti, Simpson, Cunha, & Clegg, 2021).” Reviewer Separation (of offerings) Integration (of sales roles) → Architectural redesign usually involve both integration and separation of roles/units plus other supporting changes → The goal is to ensure independence of FRs