Slide 26
Slide 26 text
3Di: Requirements for input generation
26
1D:
- Sewer system (via the municipality)
- Waterways and works of art (via the water board)
- Land use (NWRW walk-in) (+ roof slope, + type of paving)
After processing, result:
- Buildings (+ WOZ value, + number of inhabitants, +
number of floors)
- Roads (height, + link crossing to junction?)