Upgrade to Pro — share decks privately, control downloads, hide ads and more …

ARK

Sponsored · Ship Features Fearlessly Turn features on and off without deploys. Used by thousands of Ruby developers. →
Avatar for Suttisak Suttisak
August 16, 2014

 ARK

Avatar for Suttisak

Suttisak

August 16, 2014

Other Decks in Technology

Transcript

  1. Contents • Roles and Responsibilities • Operations Procedure • Equipment

    • Installation Procedure • Deployment Procedure © SFS Aviation Co., Ltd.
  2. Roles and Responsibilities • Flight Operations Officer (FOO) – Receives

    information of the situation and status from the client – Alert Operations Director or his deputy – Alert Technical Director or his deputy – Alert pilots on duty – Alert engineers on duty – Alert driver – Prepare flight plan with preparation for any bad weather • Drivers – Pickup the crews © SFS Aviation Co., Ltd.
  3. Roles and Responsibilities • Operations Director – Coordinate with the

    client for information, location and requirement – Communicate with RCC (02-2860506) about the situation – Assess the situation and consider any further action until the mission is over • Pilots on duty – Flight planning and briefing to crew members • Engineers on duty – Prepare the helicopter – Install ARK and standby for the mission © SFS Aviation Co., Ltd.
  4. General • Radio Altimeter must be serviceable and the helicopter

    should head into the wind • Make sure the ARK operation is conducted under Day Visual Meteorological Condition (VMC) only • Maximum speed for opening or closing the sliding door in- flight – 125 kts for S76 C+ – 80 (Left or BOTH ) / 100 (Right) kts for AW139 • Maximum speed for sideward flight or crosswind hover – 35 kts for S76 C+ – 45 kts for AW139 © SFS Aviation Co., Ltd.
  5. Before Flight • The commander must ensure that all equipment

    required is onboard and has been checked as appropriate • ARK operators normally install ARK © SFS Aviation Co., Ltd.
  6. Equipment • 2 ARKs • 2 Safety Harness Kits •

    2 Gloves • 1 Rope Cutter (just in case) • 2 Strap (Onboard) • 1 Head Set for Engineer (Onboard) © SFS Aviation Co., Ltd.
  7. During flight • Circuit Direction – The standard circuit direction

    is normally right hand and the final approach should be made into wind • Downwind – The aircraft should be at a height of 200 ft radalt with speed 70-80 KIAS on the downwind leg • Base – The aircraft should start to descend to arrive at the final leg at a height of 50 ft radalt © SFS Aviation Co., Ltd.
  8. Deployment Procedure • Throw the first ARK • Pull the

    White Line to Deploy • Throw away the White Line (After deployed) • Fly to the next point • Throw the second ARK • Pull the White Line to Deploy • Throw away the White Line (After deployed) • Fly away © SFS Aviation Co., Ltd.
  9. Emergencies • Intercom Failure – One of the ARK operators

    should move forward and remove the non flying pilot’s headset and shout his instructions – The non flying pilot will relay the message to the flying pilot • Single Engine Failure – The ARK’s line should immediately be cut and the helicopter maneuvered clear of the survivors – ARK operators should brace for impact in case of ditching © SFS Aviation Co., Ltd.