Share
Embed
Improving urban transit performance through advanced train control systems
Potential of India’s metro signalling & telecom market.
Understanding how the experience of the world's growing cities can benefit India's metros.
Successful delivery of signalling projects in India.
Metro Rail Asia 2009, Terrapinn
September 29, 2009 - New Delhi, India
Joffrey Lauthier
September 29, 2009
Transcript
21 slides
-
TRANSPORT Joffrey Lauthier MetroRail Asia, New Delhi 29/09/09 Improving Urban
Transit Performance Through Advanced Train Control Systems -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 2 1 | Potential of India’s Metro Signalling & Telecom Market 2 | Understanding how the experience of the world's growing metropolitan cities can benefit India's metro 3 | Successful delivery of signalling projects for India’s metros Improving urban transit performance through advanced train control systems -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 3 3 1 | Potential of India’s Metro Signalling & Telecom Market -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 4 69 87 103 137 69 87 103 137 116 170 159 216 35 44 52 69 43 50 67 34 0 100 200 300 400 500 600 700 2005-2007 2008-2010 2011-2013 2014-2016 Signalling & Telecom Market Volume* * UNIFE Study, Rail Control Solutions, Metro market in India, sales volume per year ** COM includes Public Address & Passenger Information Systems, Security, Telecom 100 50 0 M€ Rs crore TRK CBI ATC ATS COM** Market Metro Signalling -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 5 km of metro lines awarded* per year 0 20 40 60 80 100 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 * Award date is from a Signalling & Telecom package standpoint ** Delhi Lines 1-3,5-6, Delhi Airport Express, Mumbai Lines 1-2, Bangalore Lines 1-2 KM Extension New Line Conservative estimate based on the number of lines announced Market Metro Signalling 42 cities with 1M+ inhabitants 13 actively planning new metro lines -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 6 0 100 200 300 400 500 600 700 800 900 1000 1100 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Market Volume Estimate… … if half of the lines get built on time SIGNALLING TELECOM UNIFE STUDY: SIGNALLING UNIFE STUDY: TELECOM 150 100 50 0 M€ Rs crore Market Metro Signalling -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 7 Alstom 5 lines 135km Installed base and ongoing signalling projects 48% 38% 14% 2 lines 39km 3 lines 108km Market Metro Signalling Delhi L1, L2 Bangalore L1, L2 Kolkata Metro Railway -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 8 2 | Understanding how the experience of the world's growing metropolitan cities can benefit India's metro -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 9 Trends Increased ridership Line Head- Train way Length Paris Line 4 100s 90m Paris Line 7 100s 75m Sao Paulo Line 3 101s 135m + trains + CBTC in 2011 for 85s Santiago Line 1 103s 125m + trains + CBTC to be tendered Paris Line 14 105s 90m + more trains in 2010 for 85s Paris Line 1 110s 90m + trains + CBTC for 2011 With the projected increase in network coverage, India’s metros will reach capacity constraints Major metros with mature systems face capacity problems -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 10 CBTC Communication- Based Train Control PSD Platform Screen Doors Susceptibility to disruption Headway Rolling Stock Ridership Disruptions The future of metro signalling: CBTC + Platform Screen Doors Trends Increased ridership -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 11 What is CBTC? Communication-Based Train Control 1. Shorter headways 2. Increased capability to recover from service disruption Trends Increased ridership -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 12 The future of suburban lines in Asia: CBTC + ETCS • Under implementation: − Turkey: Marmaray rail link • Under consideration: − China − Korea Short Headway High Speed Long Distance CBTC Communication-Based Train Control ETCS European Train Control System Trends Increased ridership -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 13 3 | Successful delivery of signalling projects for India’s metros -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 14 Service-proven solution… … in the operating environment High Availability − Heat, Dust, Flood − Lightning strikes − etc. Track record of coping with No service disruptions − Effectively − Safely Operating in Degraded mode Delivery Lessons learned -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 15 Fully-functional solution… … on the start of revenue service Limited test slots Heavy non- regression tests Frequent upgrades Delays System instability Overcosts Postponing availability of functionalities after start of commercial service: Delivery Lessons learned -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 16 Flexible deployment Flexible teams Flexible solution − Easy system reconfiguration − Migration plan Phased approach Signalling comes last Installation, Test & Commissioning squeezed by: − Civil Work delays − Rolling Stock delays Uneven workload Frequent reconfiguration Delivery Lessons learned -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 17 Deployment and validation On-site ② Offsite ① Factory Integration & Validation Platform Extensive on-site tests in partnership with the Operator − Track data checking to discover installation differences − Opportunity to provide on-the-job training to the Operator Delivery Lessons learned -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 18 Signalling solution deployed worldwide Indian market today not large enough to amortize the cost of development of a modern metro signalling system Benefits of a signalling solution deployed worldwide on many metros − Safety Notices Safety Lifecycle cost − Path to CBTC Upgrades Delivery Lessons learned − Obsolescence management -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 19 Growing Market Competitive Pressure Increase local content Delivery Lessons learned Low High − Bangalore − Coimbatore Production Units − Delhi − Bangalore Project Offices Local Sourcing − Same quality − Same safety level Worldwide Standards -
Improving urban transit performance through advanced train control systems -
29/09/09 - P 20 Worldwide solution… … deployed by local teams Delivery Lessons learned Local project teams Worldwide expertise − Close to the customer − Committed to the project − Responsive − Cost-effective − Standard solution and processes − Return of experience − Specific technical support