  1. BUILT FOR CHALLENGES Antarctic Futures Symposium – 23 April 2026

    Jan Van Steirteghem, COO Construction BESIX Group
  2. Agenda 01 BESIX: Our foundations 02 The art of building

    and beyond 03 Build with impact 04 Princess Elisabeth Station
  3. BESIX at a glance Key figures of year 2024 BESIX

    - Built for challenges 4 N°48 Top 250 international Contractors N°1 Belgium 115+ years +25 Countries EUR 8.2 billion Order book EUR 42 million Net Income EUR 3.5 billion Revenue +10,000 employees 4 Business Lines Stable shareholding
  4. BESIX - Built for challenges 5 Committed to excellence across

    borders + EUROPE Belgium Denmark France Italy Latvia Luxembourg Montenegro Portugal Switzerland The Netherlands United Kingdom AMERICA Brazil OCEANIA Australia New Zealand AFRICA Cameroon Egypt Gabon Ivory Coast Morocco Mozambique Tanzania Oman Qatar Saudi Arabia United Arab Emirates MIDDLE EAST
  5. BESIX - Built for challenges 7 One integrated group 4

    B U S I N E S S L I N E S BESIX INVEST BESIX AFFILIATES BESIX CONSTRUCTION BESIX REAL ESTATE DEVELOPMENT
  6. BESIX - Built for challenges 8 A full-cycle partner BESIX

    Group relies on a vast and diversified expertise to take on the most complex projects from financing to design, and construction to long-term operations and maintenance O N E P A R T N E R M O R E V A L UE , LE S S CO M P LE X I T Y Time savings and coordination efficiency Quality consistency from design to maintenance Cost optimization and risk reduction Simplified project management with one trusted partner 1 2 3 6 5 4 O PERATE DESIGN FINANC E D EVELOP MAINTAIN BUILD Fully-fledged services company operating on the whole value chain
  7. 02 01 03 05 04 BESIX - Built for challenges

    9 Our in-house engineering expertise Significantly enhancing the value BESIX offers to its clients OUR KEY EXPERTISE AREAS OUR ENGINEERS WORK WITH PROJECT TEAMS FROM DAY ONE  to align design with execution  to unlock smart and tailored solutions  to reduce risks and uncertainty  to improve cost and time efficiency GEOTECHNICAL ENGINEERING Safe and efficient foundations adapted to site conditions CONCRETE TECHNOLOGY High-performance and sustainable materials CONSTRUCTION METHODS AND PLANNING Optimised execution using BIM and System Engineering
  8. Our ENVIRONMENTAL Engagement Our PEOPLE Engagement Our SOCIETAL Engagement Our

    BUSINESS Engagement BESIX - Built for challenges 11 Our Sustainability & ESG Commitments Creating stakeholder value whi le reducing environmental impact and maximisi ng positive social contribu tions BESIX G RO UP’S CO RE UNITE D NA TIONS S UST AINABL E D EVE LOPMENT GO ALS In 2023, BESIX conducted a Double Materiality Assessment to align its strategy with both its ESG impacts and financial risks
  9. BESIX - Built for challenges 14 Overview of the project

    Next-generation Belgian polar research station • Located in Antarctica (Utsteinen site) • Developed under the BELARE 2007-2008 programme lead by Alain Hubert • Designed as a high-performance, energy-autonomous building • Zero-emission concept: • Energy autonomy • Efficient use of resources • Water recycling • Built to operate in extreme climatic conditions • Intended for scientific research during southern summer seasons • Recognised as an international reference project, with interest from NASA and ESA for future missions
  10. 15 BESIX as main construction partner Involved from the outset

    • Early design involvement • BESIX Engineering Department contributed to the conceptual design phase • Off-site construction coordination (Belgium): • Coordination of the entire construction process including logistics, planning, sequencing. • Preparation, testing, pre-assembly of station components in Brussels (Tour & Taxis). • Managing all interfaces from designers, fabricators to logistics partners. • Lead contractor on-site (Antarctica): • Lead contractor during on-site construction (very short austral summer). • Responsible for the final assembly and construction under extreme climatic conditions. BESIX - Built for challenges
  11. • Main structural works • Erection of the steel supporting

    structure • Assembly of the wooden base frame – about 450 components • Installation of façade and roof elements • Construction of the tower structure • Specialised structural tasks • Anchoring the station to the granite bedrock of the Utsteinen Ridge • Assembly of a modular post-and-beam structure with nearly 100 prefabricated modules • Installation of high-performance wall modules with multiple insulating layers • Delivery of an airtight, wind-resistant and energy-efficient envelope Structural & technical construction Extreme climate, logistics & precision 21/04/2026 Insert title of presentation 16
  12. • Early design involvement is critical to enable efficient off-site

    prefabrication and on-site assembly • Robust logistics planning is essential; transport can become the main critical path rather than construction • Adaptability on site is key when working with extreme weather and limited resources • Strong coordination between teams (design, pre-assembly, site) significantly improves execution speed • Technical resilience and on-site problem-solving skills are vital in remote environments • Multidisciplinary and experienced teams perform effectively when roles, objectives and leadership are clear Key lessons learned Early involvement and expertise Insert title of presentation 17
  13. BESIX - Built for challenges 18 JAN VAN STEIRTEGHEM CO